HOW IT WORKS

Install System in Trailer

Install at Origin - Shipper Loads Portable Decking System in Trailer, where applicable on sidewall, and

then loads more freight on 2nd level.  (using from

One Decking Set up to a Full-Length Row)

FULL LENGTH ROWS INSTALL AND REMOVE IN

2.38 MINUTES (both sides)

Load Freight

Customizing the height to optimize the load.

Photo 10.jpg
Photo 7_edited.jpg

Unload Freight

Remove at Destination – Shipper/Customer Personnel Unloads Freight and Removes Decking System

Disassemble System for Return to Origin

Decking System is returned to Shipper’s Origin by LTL or Dedicated Trailer

Photo_edited.jpg

Disassemble System for Return to Origin

Decking System is returned to Shipper’s Origin by LTL or Dedicated Trailer

Photo_edited.jpg