top of page

HOW IT WORKS

Install System in Trailer
Install at Origin - Shipper Loads Portable Decking System in Trailer, where applicable on sidewall, and
then loads more freight on 2nd level. (using from
One Decking Set up to a Full-Length Row)
FULL LENGTH ROWS INSTALL AND REMOVE IN
2.38 MINUTES (both sides)
Load Freight
Customizing the height to optimize the load.



Unload Freight
Remove at Destination – Shipper/Customer Personnel Unloads Freight and Removes Decking System
Disassemble System for Return to Origin
Decking System is returned to Shipper’s Origin by LTL or Dedicated Trailer

Disassemble System for Return to Origin
Decking System is returned to Shipper’s Origin by LTL or Dedicated Trailer


Before
After


Want More Information Specific to You?
Let's work together to bring the best value to your shipping operations
bottom of page